← Current Projects

Private Cinema  ·  Gauteng

Heldefontein

Installation

A dedicated private cinema built on a simple principle — you should see the image and hear the room, and nothing else. Every amplifier, source and run of cabling lives in an equipment rack outside the space, leaving a 135-inch acoustically transparent screen and a true immersive sound field as the only things in the room.

Design render of the Heldefontein private cinema — acoustically transparent screen, lounge seating and concealed lighting
Design intent  ·  The finished room

The Approach

Engineered around the screen, not around the speakers.

Three Paradigm CI Pro P1 reference channels sit directly behind the screen, firing through its acoustically transparent surface so dialogue and score arrive from the picture itself rather than from beside it. In-wall surrounds and a pair of in-ceiling height channels complete a Dolby Atmos layout, with two twelve-inch Defiance subwoofers carrying the low end evenly across the seating.

A 5,000-lumen Optoma laser projector throws a bright, stable 4K image that holds up under the warm, low-level lighting the room is designed around. Everything resolves to a single Control4 interface — one press dims the lights, closes out the room and starts the film. Acoustic treatment and joinery are executed by Modco; IHO supplies and installs the audio-visual system, the control layer and the rack that keeps it all out of sight.

System at a Glance

Control SystemControl4
Processing & AmplificationMarantz CINEMA 40 AV amplifier — rack-mounted outside the room
Front Stage (Behind Screen)3× Paradigm CI Pro P1 LCR
Surrounds4× Paradigm CI Home HW55 in-wall (side & rear)
Overhead Height Channels2× Paradigm CI Pro P80-R v2 in-ceiling
Low Frequency2× Paradigm Defiance 12-inch subwoofers
ProjectionOptoma UHZ68LV — 4K laser, 5,000 lumens
ScreenStewart Balón Edge 135-inch, Harmony G3 acoustically transparent
ConfigurationDolby Atmos 7.2.2
Acoustics & JoineryModco

Work Underway

Screen-wall framing at Heldefontein over an acoustically dampened wall, with concealed ductwork boxed in and ready for the acoustically transparent screen
Screen-wall framing & first-fix wiring
Surround speaker mounted into an acoustic side-wall panel, with speaker cable dressed and coiled behind the panel
Surround set into the acoustic side-wall panel
In-ceiling Paradigm height channel installed flush in the plastered cinema ceiling near the bifold doors
In-ceiling height channel, flush-fitted
Cinema ceiling with overhead speaker and a linear HVAC grille, services concealed within the bulkhead
Overhead channels & concealed climate services
Modco acoustic wall panels being fitted over the dampened substrate, with cabling dressed behind
Acoustic wall panels going up  ·  Modco
Acoustic treatment underway across the cinema walls with framing and panelling in progress
Wall treatment & framing in progress

Project Progress

Phase 1  ·  Discovery

Complete

Client brief, site survey and acoustic assessment completed.

Phase 2  ·  Design

Complete

AV design, acoustic modelling and equipment specification signed off.

Phase 3  ·  Installation

In Progress

Structural works, acoustic treatment, equipment rack build and cable infrastructure underway.

Phase 4  ·  Commissioning

Calibration, processor tuning and system integration.

Phase 5  ·  Handover

Client training, documentation and SLA activation.

Interested in a similar project?

Tell us about your space and we will walk you through what is possible.